Updated

Enterprise Programs

Warehouse capacity for requirements that do not fit a web form.

A program at enterprise scale is not priced off a web form. Warehouse Bridge places dedicated and multi-client programs with pre-vetted operators across the United States. Tell us the requirement once and get matched operator quotes normalized to one specification, in days rather than the eight to twelve weeks a formal RFP takes. Two or three operators quote the same scope in the same format, so the quotes compare line by line. You contract directly with the operator, and Warehouse Bridge stays in for transition support and does not charge for the match.

Procurement teams open the vendor file before they read positioning, so it is on this page rather than behind a form: contracting party, insurance posture, NDA and MSA, data retention, operator due diligence, and a named contact.

Pre-vetted
Partner facilities
Nationwide
Every major US market
50,000+
Sq ft program minimum
Same scope
Comparable operator quotes

Built for procurement, not for browsing

No conflict of interest.

Warehouse Bridge operates no warehouse of its own. There is no building we need to fill, so the operator that fits your specification wins the work. That neutrality is the reason our quotes are comparable rather than steered.

One specification, normalized quotes.

Requirements go to operators in a single normalized format so the quotes you receive can actually be compared line by line: first pick and additional pick split out, storage basis defined, receiving unit of measure stated.

Itemized, comparable bids.

Every quote is itemized in the same format, so you can validate any bid line by line, including bids from providers we did not introduce.

Program types

Program types
ProgramWhat it isTypical scaleTypical term
Dedicated contract logisticsDedicated space, dedicated labor, governed by an SLA, open-book or fixed management fee100,000+ sq ft, one full shift sustained3-5 years
Multi-client (shared)Shared floor and labor, priced per transaction, flex up and down with volume5,000-100,000 sq ft equivalent1-2 years
Hybrid core plus overflowDedicated core for baseline volume, flexible network capacity for peakBaseline dedicated, peak flexedMixed
Project and transition capacityShort-term space for launches, transitions, recalls, stagingProject-scopedWeeks to months

For the full decision framework on dedicated vs multi-client, see the Contract Warehousing page.

Procurement resources

Vendor onboarding first, then the guides and workbooks. Everything here is free to use, including in a process that never involves us.

Compliance and capability

Enterprise programs run under the same compliance constraints your own network operates under. The pre-vetted network is screened against these before a facility is shortlisted for a requirement.

  • Retail routing-guide compliance and EDI (850/856/810)
  • FDA, USDA and HACCP food-grade
  • Bonded and customs-deferred storage
  • Temperature-controlled from frozen to ambient
  • Hazmat-certified space
  • Multi-node national networks
  • Peak surge capacity

How an enterprise requirement runs

1

Requirement intake

One specification covering volume, profile, geography, compliance, timing.

2

Operator shortlist

Matched from the pre-vetted network against that specification, not against who has space to fill.

3

Normalized quotes

Operators quote the same scope in the same format, so the bids compare line by line.

4

Selection and transition

You contract directly with the operator; we stay in for transition support.

Typical elapsed time from intake to comparable quotes is days, against eight to twelve weeks for a formal RFP process.

What happens on a scoping call

Forty-five minutes, no deck, no discovery theatre. The call exists to write your requirement down accurately enough that operators can price it without a second round of questions. Below is who is on it, what gets asked, what comes back, and when.

Who is on the call

From Warehouse Bridge

One person, and it is the person who writes your specification and runs the operator matching against it. There is no separate discovery rep, no solutions engineer to be booked for a second call, and nothing to be escalated afterwards.

From your side, required

Whoever owns the volume numbers, usually operations or supply chain, and whoever owns the commercial terms, usually procurement or finance. Those answers come from different people and running them as two calls adds about a week.

From your side, if in scope

The owner of retail routing-guide and EDI compliance, and the owner of food-grade, bonded, hazmat, or temperature requirements. If they cannot attend, the specification goes out marked open on those points and operators price them as risk.

What gets asked

0-10 min

Volume and profile

Units, orders per month, SKU count, pallet positions, seasonality curve, inbound container or LTL cadence, storage basis you want to be billed on.

10-20 min

Geography and service

Where demand sits, delivery windows you have to hit, whether one node covers it or the requirement needs a second, and what has to stay in-house.

20-30 min

Compliance and systems

Retail routing guides and EDI sets, food-grade or bonded or hazmat requirements, temperature bands, WMS and integration expectations, reporting cadence.

30-40 min

Commercial structure

Dedicated, multi-client, or hybrid. Open-book against closed-book. Term, exit rights, KPI targets, and whether service credits apply.

40-45 min

What happens next

We restate the requirement back as a written specification for your sign-off. Nothing goes to an operator until you approve that document.

What you leave the call with

  • A written normalized specification you own and can reuse in any RFP, including one that never involves us.
  • A shortlist of matched facilities with the reason each one is on the list.
  • A named list of what we still need from you, and what you still need from us, with owners against each item.

What comes back, and when

Next business day

Written specification

The requirement comes back as a normalized specification document for your sign-off. It is yours to keep and reuse, including in an RFP that never involves us. Nothing goes to an operator before you approve it.

Within days of sign-off

Matched shortlist

Facilities matched against the specification, each with the reason it is on the list, plus certification copies where food-grade, bonded, hazmat, or temperature requirements apply.

Days, not weeks

Quotes comparable line by line

2-3 operators price the same scope in the same format: first pick and additional pick split out, storage basis defined, receiving unit of measure stated. You contract directly with the operator you pick.

The gate is your sign-off on the written specification, not our calendar. No operator sees the requirement until you approve that document, and you can stop there and run the process yourself with it.

Vendor information

The file most procurement teams open before they read positioning. Everything below is either published elsewhere on this site or available on request, and we have said which is which.

Vendor information
Operating nameWarehouse Bridge
Business typeWarehouse and 3PL matching platform. Operates no warehouse, no truck, and no fulfillment labor of its own.
CoveragePre-vetted partner facilities in every major US market
Cost to the brandNone. Matching, benchmarking, and transition support are free to the brand. Revenue comes from the operator side.
Contracting partyThe warehousing agreement is executed with the operator, either directly or through Warehouse Bridge acting as your authorized representative where you prefer that. Warehouse Bridge does not take title, custody, or possession of goods in either case.
Data handlingRequirement details are shared only with the pre-vetted facilities being matched to that requirement, limited to what those facilities need to quote it. See the Privacy Policy.
LanguageEnglish
Procurement contactsolutions@warehousebridgeco.com

Documentation on request

Here is exactly what a procurement team can obtain and when.

Corporate and tax documentation

Registered legal name, registered address, and the tax form (W-9) are provided on request at vendor onboarding. We will complete your supplier registration or vendor portal intake directly.

Insurance

Our certificate of insurance is provided on request. Because you contract with the operator, the coverage that governs your goods is the operator's: certificates of insurance, coverage limits, and where applicable workers compensation clearance are requested from every shortlisted facility so they are in hand before you select one.

Agreements and confidentiality

A mutual NDA can be executed before any requirement detail is shared, and a master service agreement can be put in place for your legal team to review before you commit to a process.

Operator due diligence

Capacity, certifications (food-grade, bonded, hazmat, temperature-controlled), systems, and compliance profile are confirmed before a facility enters the matching pool. Certification copies for a shortlisted facility are provided with the quote so your own audit can start immediately.

References

Operator references for a shortlisted facility are provided on request. We will tell you plainly when a reference is an operator reference rather than a platform reference. We do not present one as the other.

Vendor onboarding requests go to solutions@warehousebridgeco.com. Published policies: Terms of Use and Privacy Policy.

Scoping a program?

Tell us the requirement and we will come back with matched operators and quotes normalized to one specification. Requirements above 50,000 square feet or 10,000 orders per month get a call rather than an email.

Start an enterprise requirement
solutions@warehousebridgeco.com

Procurement questions

What vendor documentation can Warehouse Bridge provide for procurement onboarding?

Warehouse Bridge provides its registered legal name, registered address, tax form (W-9) and certificate of insurance on request at vendor onboarding, and will complete a supplier registration or vendor portal intake directly. A mutual NDA can be executed before any requirement detail is shared, and a master service agreement is available for legal review beforehand. Because the warehousing agreement is executed directly with the operator, facility-level certificates of insurance, coverage limits, and certification copies are collected from every shortlisted operator and provided with the quote.

What is the difference between dedicated and multi-client warehousing?

Dedicated warehousing assigns one operator's space and labor to a single tenant, governed by a service level agreement with open-book or fixed pricing. Multi-client (shared) warehousing pools floor space and labor across multiple tenants inside one facility, with each tenant billed per transaction. Dedicated suits high, steady volume; multi-client suits variable or seasonal volume that cannot fill a building on its own.

When does a dedicated warehouse operation make financial sense?

A dedicated operation makes financial sense once volume is high enough and steady enough to fill 100,000 square feet or more and keep at least one full shift busy year-round. Below that threshold, the fixed cost of an underutilized dedicated building typically exceeds the per-unit savings dedicated pricing offers over shared multi-client rates. Seasonal or growing volume usually fits multi-client better until that scale is reached.

What is the difference between open-book and closed-book 3PL pricing?

Open-book pricing passes through the operator's actual labor, space, and overhead costs, with a management fee typically 4 to 8 percent of operating cost added on top, so the client sees the underlying cost structure. Closed-book pricing charges fixed unit rates per pallet, case, or order, with the operator's margin embedded in the rate and not disclosed. Open-book suits complex or volatile operations; closed-book suits stable, well-defined volume.

How long does it take to get comparable operator quotes?

Comparable operator quotes arrive much sooner than a formal RFP once the requirement is written to a normalized specification covering volume, storage basis, and pick structure in one format multiple operators can price against. A formal RFP process, by comparison, usually takes eight to twelve weeks from drafting through vendor responses and evaluation. The gap comes from the specification work happening once instead of being repeated by each bidder.

What KPIs belong in a 3PL service agreement?

A 3PL service agreement should set targets for order accuracy (99.5 percent standard, 99.9 percent leading practice), on-time shipping (98 percent standard, 99.5 percent leading practice), inventory accuracy (99.5 percent standard, 99.9 percent leading practice), and dock-to-stock time (24 hours standard, 8 hours leading practice). Each KPI should carry a defined measurement method and, where dedicated pricing applies, a service credit tied to missing target.

How many distribution nodes does a national network need?

It depends on where your customers are and how fast you need to reach them. Each node shortens transit time to the customers near it, but each additional node raises required safety stock under the square root law, and moving from one node to two typically increases total safety stock by about 41 percent. Network size should be justified by service need, and the operators we match can model the trade-off against your order destinations.

Does Warehouse Bridge operate its own warehouses?

No. Warehouse Bridge operates no warehouse of its own, so there is no building it needs to fill, and the operator that fits the specification wins the work. This applies to every requirement it sources. The service is free for brands; Warehouse Bridge does not charge tenants for matching, benchmarking, or transition support.

Does Warehouse Bridge only handle enterprise requirements?

No. The same pre-vetted network also places short-term overflow and project capacity, which typically runs month to month inside a 3 to 12 month window. Commitment structure follows the program rather than the customer: project and overflow capacity is short-term by design, multi-client contract programs typically run one to two years, and dedicated contract programs typically run three to five years. Requirements from 50,000 square feet or 10,000 orders per month run through the scoping call and normalized-quote process described on this page.

Ready to write the requirement down?

Send the volume, geography, and compliance profile. We come back with matched operators and quotes normalized to one specification. Requirements above 50,000 square feet or 10,000 orders per month start with a scoping call.

Start an enterprise requirement
Get an instant estimate